How it works
Every open order becomes a promise, checked every morning. When one is at risk, you see the ways through, each priced, and Corrid does the one you approve.
Tuesday, 17 November
Good morning. One promise needs you.
Promises watched
94
+6 this week
At risk
$24,900
1 promise · Order 4471
Kept this month
37
$412,600 of margin
Promises to customers
Sorted by what is at stake
Northfield Trailers
12,000 brackets · #4471
Due 27 Nov
$24,900
At riskGrand River Ag
Hitch plates · #4455
Due 21 Nov
$11,300
KeptLakeside Plastics
Housing, rev B · #4486
Due 29 Nov
$8,240
On trackWellington Trailers
Bracket BR-204 · #4511
Due 9 Dec
$8,220
On trackHarbor Metals
Coil cut-to-length · #4490
Due 2 Dec
$5,610
On trackKeller Tool
Die set repair · #4502
Due 4 Dec
$3,900
On trackDana is out three days. Order 4471 slips to 2 Dec.
Ways through, priced against doing nothing
Run 4471 first on Press 2
Move 4502 back two days
$1,800
on time
Saturday overtime, Marco sets
Two shifts
$3,200
on time
Tell Northfield: 2 Dec
Late clause applies
$6,200
5 days late
Nothing is sent until you approve the exact words.
ApproveEvery figure is what that choice costs you in total: money spent, time lost and any penalty. Where a cost isn’t known yet, Corrid says so and asks.
What it is
Corrid reads what you already have, keeps every promise in view, and does the work to protect it once you approve.
June is the part of Corrid you talk to. It reads what you connect, checks every promise each morning, and drafts the work when one is at risk. June never decides for you: nothing leaves your business until you approve the exact words.
Specs
What it reads
- Books
- QuickBooks Online or Xero
- Orders
- An export, a spreadsheet or forwarded POs
- What you forward, or an inbox you connect
- Files
- Only the ones you pick
- Access
- Read-only
How it works
- Unit
- The promise to a customer
- Checked
- Every day
- Numbers
- Formula, inputs, source and date shown
- Binding steps
- Only with your approval of the exact words
- Writes
- One: an approved PO, if you switch it on
The domino effect
Nothing in a business slips alone.
Every promise rests on people, machines, materials and money, and each of those rests on something else. When one slips, the next one falls, and the one after that. Corrid holds the whole chain, so it sees the first one fall.
01
Dana is out
The only setter for Press 2
02
Press 2 sits idle
Six jobs wait behind it
03
Order 4471 slips
From 27 Nov to 2 Dec
04
Northfield waits
A late clause applies
05
$24,900 at risk
Found at month-end, if at all
One slip, and everything resting on it follows.
Step by step
From what you know to what gets done.
- 1.1
You say
We stamp brackets for Wellington Trailers. Coil comes from Lomas Group. Only Maria can set the dies.One personMaria, tool and die
2 products only she can set
Bracket BR-204
$12,400/mo margin
Single sourceLomas Group
$9,060 depends on it
Wellington Trailers
$8,220 open orders
Tell
1 minto start your Arc
Tell Corrid about your business, once.
Say it the way you would to a colleague, or drop in a file. Every fact becomes a card, and cards connect from supplier to customer.
- 1.2
Margin · Order 4471
$24,900
(price − cost per part) × parts
= (10.38 − 8.305) × 12,000Price per part$10.38verifiedCoil, 0.42 kg$0.63estimatedConversion and finishing$7.675verifiedValue
4things behind every number
Every number shows its working.
Formula, inputs, source and date, and whether each input is verified or estimated. The calculation engine does the arithmetic, never the assistant.
- 1.3
Single source: Lomas Group
$9,060 of margin a month depends on one coil supplier.
Only Maria can set the dies
Two products stop if she is away.
Idle press: $12,341 a month
30 of 80 hours unused. Two shops nearby need that process.
Tariff risk on US-origin coil
June suggests a watch, one of ten included this month.
Notice
Dailyevery promise, checked
It notices what you were not counting.
A single supplier, a machine sitting idle, a skill only one person has. Each named with what it is worth.
- 1.4
Route plan · Order 1182
Decide by Sat 7 Nov- Likely late
- 7 to 13 days
- Margin at risk
- $16,000, verified by you
- Biggest unknown
- Can Great Lakes Steel supply in 8 days?
- Fallback
- Expedite by air, if no answer by Sat
Great Lakes SteelSuggestedon time+$2,100Expedite by airon time+$4,200Import stockist4 days late+$600Decide
3ways through, each priced
When something slips, you get a route plan.
Every way out priced against doing nothing, by your goals, with a fallback and a date to decide by.
- 1.5
Execution · 6 of 9 steps
Signal
Ways out
You approve
Requests out
Replies
Choose
PO to dock
Invoice matched
Paid
June · Policy gate → suppliers · 05:00
Sent to Great Lakes Steel and the air expediter. Quotes due Tue.Great Lakes Steel\u2019s system → June · 07:00
Can supply 4,000 kg at $1.26/kg, 8 days.You · 11:00
Chose Great Lakes Steel: on time, $2,100 less, and a second source.Approve
1approval, on the exact words
You approve the exact words. Corrid sends them.
Corrid then tracks the replies and drafts each follow-up for your approval; you can let it send one reminder on its own. Anything new needs a new approval.
Your systems
Your systems stay as they are.
Corrid sits beside what you already use. Drop in a file, paste a list, or just tell June. Connect your books later, read-only, only if you choose. It reads; you decide what leaves.
On an ERP? Direct ERP connections are coming. Until then, an export or a spreadsheet of your open orders works just as well.
- BooksQuickBooks Online · Xero
- EmailGmail · Outlook
- FilesGoogle Drive · OneDrive
- OrdersGoogle Sheets · Excel or CSV
- Or just tell CorridDrop in a file, or say it to June in chat
Your Arc
Private to your business
- A request to a supplierThe requirement only
- A note to a customerIn your words, approved
- A purchase orderInto QuickBooks or Xero, only if you switch it on